Project - Fallen Timber Run

Updated: April 11, 2018 - 5:20pm

Waterline Relocation - SR0051-A5B Elizabeth and Forward Townships, Allegheny County 500' - 8" C900 CL235 Fusible PVC A culvert on SR0051 will be replaced by PennDOT. MAWC will replace and relocate the existing waterline along SR0051, Elizabeth and Forward Townships, Allegheny County 75.0% PennDOT...Read more

Project - Main, Jantosik Streets and Piper Road, West Leechburg Borough

Updated: July 27, 2018 - 10:54am

MAWC will replace existing water mains in the Borough of West Leechburg to increase delivery capacity and enhance fire protection. Specifically, we will install approximately 3,240 feet of 8-inch C900 CL235 PVC pipe0 and 400 feet of 4-inch C900 CL235 PVC pipe to replace existing 2,4 and 6-inch...Read more

Project - Broadview Road, New Stanton

Updated: March 5, 2019 - 10:29am

MAWC will extend approximately 3,285 feet of 12-inch C900 CL 235 PVC pipe, 145 feet of 12-inch C151 CL52 ductile iron pipe and 40 feet of 12-inch fusible C900 CL235 PVC pipe along Broadview Road and Hunker Waltz Mill Road in the Borough of New Stanton and Hempfield Township. The estimated project...Read more

Project - Alpine Tank

Updated: February 15, 2018 - 3:27pm

The $1.58 million, 950,000-gallon Alpine water tower is located next to the former Centennial School. The new Alpine tank will supplement a neighboring 1,000,000 gallon tank, increasing the treated water reserve for McKeesport customers.Read more

Project - Nowrytown East

Updated: February 15, 2018 - 10:16am

ENGINEERING SERVICES FOR THE INSTALLATION OF APPROXIMATELY 4200 LINEAR FEET OF 8·1NCH DIAMETER WATER MAIN ALONG SPERANZA ROAD ANO ELDERS RIDGE ROAD TO PROVIDE WATER SERVICE IN CONEMAUGH TOWNSHIP, INDIANA COUNlY. l'roposod net Expenditure $15,000.00 REIMBURSEMENT FOR ENGINEERING COSTS (INCLUDING...Read more

Project - Slope Hill Road

Updated: February 15, 2018 - 10:01am

INSTALL APPROXIMATELY 6100' OF 8 INCH MAIN WATER LINE FOR AN ESTIMATED COST OF $420,525 ALONG SLOPE HILL ROAD IN MOUNT PLEASANT TOWNSHIP. THE ABOVE WILL COVER THE COST TO INSTALL APPROXIMATELY 6100' OF 8" PVC C-900 CLASS 235 OR18 PIPE TO PROVIDE WATER SERVICE TO SLOPE HILL ROAD, MOUNT PLEASANT...Read more

Project - 36-inch Kicker Way to Garden Street

Updated: June 4, 2018 - 2:20pm

Install 4,150 feet of 36-inch transmission main for an estimated cost of $3,651,000. Project Underway: All Construction Completed, 90 percent restoration complete. Testing remains to be done before putting the line into service Project estimated completion date: Spring 2018Read more

Project - Harrison City Manor Road

Updated: July 27, 2018 - 10:44am

Replace 1940s pipe with 12" PVC at an estimated cost of $2,500,000. Approximately 120 services replaced. Main and Service Construction Completed overlay paving being scheduled. cost to date $2,690,000Read more

Project - Vandergrift

Updated: September 24, 2018 - 8:45am

Water line replacement of approximately 4,540 feet of existing pipe with 8-inch PVC along Bryant, Holland and Lowell streets, with 130 services replaced. Cost projected $2,070,300Read more

Project - S. Greensburg pump station to Kicker Way, 48 inch transmission main

Updated: July 27, 2018 - 10:59am

Install approximately 1,246 feet of 48-inch ductile iron pipe. Projected cost $2,910,000 This project is underway and on schedule. 95% completed. All water main is installed, a waiting testing, and project restoration. Cost to date $1.49 millionRead more