RATE SCHEDULE EFFECTIVE April 1, 2018
Standard Water Rates | ||||
---|---|---|---|---|
Size of Meter |
Qtr Minimum |
Qtr Allowance |
Mth Minimum |
Mth Allowance |
5/8" |
$ 61.79 |
3000 gallons |
$ 20.60 |
1000 gallons |
3/4" |
$ 72.47 |
3000 gallons |
$ 24.16 |
1000 gallons |
1" |
$ 91.91 |
3000 gallons |
$ 30.64 |
1000 gallons |
1 1/2" |
$ 163.48 |
3000 gallons |
$ 54.49 |
1000 gallons |
2" |
$ 257.09 |
3000 gallons |
$ 85.70 |
1000 gallons |
3" |
$ 500.69 |
3000 gallons |
$ 166.90 |
1000 gallons |
4" |
$ 743.26 |
3000 gallons |
$ 247.75 |
1000 gallons |
6" |
$ 1,469.12 |
3000 gallons |
$ 489.71 |
1000 gallons |
8" |
$2,433.63 |
3000 gallons |
$ 811.21 |
1000 gallons |
10" |
$ 3,630.84 |
3000 gallons |
$ 1,210.28 |
1000 gallons |
12" |
$ 4,827.98 |
3000 gallons |
$ 1,609.33 |
1000 gallons |
- Quarterly: Next 237,000 gallons, $8.57 per 1000 gallons.
- Quarterly: Over 240,000 gallons, $5.37 per 1000 gallons.
- Monthly: Next 79,000 gallons, $8.57 per 1000 gallons.
- Monthly: Over 80,000 gallons, $5.37 per 1000 gallons
As of April 1, 2003, add $1.00 per quarterly bill for capital surcharge (Ligonier water on February 11, 2013). Monthly accounts assessed $0.33 per bill 1st and 2nd month and $0.34 in 3rd month.
Temporary Service
Service of a temporary nature such as required for building and construction purposes, etc., will be rendered under the metered rates. The cost of installation and removal of any facilities required to render such temporary service are to be borne by the applicant for service. Upon approval of an application for the supply of water service to any property not previously supplied, the following service connection fees will be charged by the Authority.
Temporary Service | |
---|---|
3/4" service |
$2,700.00 |
1" service |
$2,800.00 |
1" doubled 3/4" |
$3,500.00 |
2" |
$5,000.00 |
4" |
$10,000.00 |
6" |
$15,000.00 |
8" and larger |
$20,000.00 |
Fire Service
Public Fire Protection
If a fire hydrant installation is required by a political subdivision the applicant will make a deposit of $1200.00 representing approximately 50% of the cost of such installation. Requests for fire hydrant installation will be accepted only on existing water mains of sizes six inch and larger provided, however, the hydrant branch shall not exceed 20 feet in length. If installation is requested on a pipe line larger than 12 inch in size, then the political subdivision will pay 50% of the actual cost of the installation, deposit to be made in advance based on the estimated cost.
Public Fire Service
Each Public Fire Hydrant, $50.00 per annum
Private Fire Protection
Applications will be accepted for private fire service provided water mains of adequate size as determined by the Authority, exist at the location. The installation will be made at the expense of the customer.
Private Fire Service
- Each fire hydrant, $474.43 per annum
- Each 4" connection or smaller, $762.08 per annum
- Each 6" connection, $2,664.04 per annum
- Each 8" connection, $4,563.86 per annum
- Each 10" connection, $7,607.86 per annum
- Each 12" connection, $11,411.80 per annum
* No charge shall be made for water used in the extinguishing of accidental fires and water for other purposes shall not be drawn from a private fire connection